Taylors Creek Sewerage Catchment Modelling
In 2017 Urban Water Solutions built and calibrated an InfoWorks ICM hydraulic model of the Taylors Creek sewerage system for City West Water. The system serviced a catchment of 2,600ha with a population of approximately 46,000 and carried predominantly residential loads.
A good level of calibration was achieved for both dry and wet weather, and the calibrated model was a sufficiently robust tool for City West Water to use for future planning and system augmentation. Urban Water Solutions identified deficiencies in the system and provided advice regarding further data collection which could further increase the veracity of the model.